MIL-STO-2219A
w/CHANGE 1
4.4.2.2 Cooling furnaces
Cooling furnaces shall be provided with suitable means for controlling the cooling rate.
4.5 NOE procedure qualification
4.5.1 Radiographic inspection
Qualification of radiographic inspection procedures, including film processing procedures, shall be in accordance with ASTM-E1742.
4.5.2 Ultrasonic inspection
Qualification of ultrasonic inspection procedures shall be in accordance with SAE-AMS- STD-2154.
4.5.3 Magnetic particle inspection
Qualification of magnetic particle inspection procedures shall be in accordance with
ASTM-E1444.
4.5.4 Penetrant inspection
Qualification of penetrant inspection procedures shall be in accordance with ASTM- E1417.
4.5.5 Other nondestructive tests
Nondestructive tests, procedures, techniques, equipment and materials not specifically addressed in this document may be used if approved in the contract or by the cognizant engineering organization.
4.6 Qualification of inspection personnel
4.6.1 Qualification of NOE personnel
Nondestructive examination personnel shall be qualified in accordance with AIA/NAS410 or other NOE standards satisfactory to the cognizant engineering organization. When the contract, purchase order or engineering drawing specifies the use of examination methods not presently incorporated in AIA/NAS410, the manufacturer shall be responsible to develop and submit for approval to the cognizant engineering organization training programs, written procedures, examinations, and practical demonstrations equivalent to those required for the other examination methods covered by AIA/NAS410 or other NOE standards. These shall establish the capability of the personnel to perform the required examinations.
9
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business